Co-op & municipal utility analytics

Power BI for Utilities: Reliability, Meter Reads, Water Loss and Cost vs Budget for Co-ops and Municipal Systems

Power BI for utilities that run the wires and the pipes: we join your outage management, billing, meter data, work orders and ledger into one live view — outage minutes per customer served, meters that missed their reads, water that never reached a bill, and operating cost against the budget your board approved.

Scope approved before any hours are used · Hours never expire

  • Microsoft-certified
  • Hours never expire
  • 3–5 day turnaround
  • No project minimums
  • You own everything
Utility overview SAIDI12.4k SAIFI and CAIDI1,284 Meter read success326 Non-revenue water$86k Monthly performance By segment 64%

Sample utility dashboard. Illustrative data, not a client’s numbers

Five systems, one monthly board question

Every system reports well on its own, and none of them answers "how did we do this month?"

A distribution utility keeps its numbers in systems that were bought for different jobs. The outage management system knows every interruption and how many customers sat behind the device that opened. The customer information and billing system knows who was billed, on what read, and whether the read was estimated. The meter data management system knows which meters stopped talking. The work management system knows which crews closed what. The ledger knows what it all cost. Each prints a competent report; none of them puts outage minutes, meter read performance, water loss, work order backlog and cost against budget on one page, for the same month and the same service territory.

That join is what Power BI for utilities should deliver, and it is the build. We model those systems into one governed set of definitions so the general manager, the finance director and the board read the same reliability index, the same non-revenue water figure and the same budget variance — with each district or department seeing only its own.

This is a regulated-distribution build, not a production one. Utilities are measured per customer served; an upstream operator is measured per barrel lifted, and that work — well production, lease operating expense and AFE against actual — lives on Power BI for oil and gas companies. The focus here is electric cooperatives and municipal electric and water systems rather than large investor-owned utilities running NERC and FERC compliance programs.

The two measures a utility board asks about first

How long customers were out, and how much water went missing

SAIDI = customer minutes interrupted ÷ customers served  ·  Water losses = system input volume − authorized consumption — the first is the reliability story, the second is the revenue that left through a leak or a slow meter.

Try us risk-free for 4 hours

Buy a block of prepaid Flex hours and, if you're unhappy within the first 4 hours, we refund you in full — no questions asked. Hours are deducted only for work you've reviewed and approved, there's no project minimum, and your banked hours never expire.

Start my risk-free 4 hours →

Screens a utility uses every week

Six views that decide where crews, capital and budget go next

Each one ends in an action — trim a circuit, swap a meter, find a leak, clear a backlog or explain a variance — rather than a wall of gauges.

Outages and reliability indices

Customer minutes interrupted, SAIDI, SAIFI and CAIDI by substation, feeder and district, with major event days flagged, and the outage causes — vegetation, equipment, animals, weather — ranked by the minutes they cost.

Meter reads and estimated bills

AMI read success by route, substation and meter type, meters that have missed reads for several days running, and the bills issued on an estimate, ranked as a field worklist for the metering team.

Water loss and non-revenue water

System input against billed and unbilled authorized consumption, with apparent losses and real losses kept apart, trended by pressure zone, and main breaks and leak repairs plotted against the same months.

Work orders and backlog

Opened, closed and aging work orders by type — outage restoration, service connects, meter changes, preventive maintenance — with labor hours and materials so the backlog has a cost as well as a count.

Operating cost against budget

Actual against the approved budget by function and department, monthly and year to date, with purchased power or treatment cost separated from controllable operating and maintenance spend.

Customers, consumption and revenue

Active accounts by rate class, consumption and billed revenue against the same month last year, and arrears aging by customer class, so a revenue miss can be traced to weather, rates or collections.

What should a utility dashboard measure?

A utility dashboard should measure what the board and the regulator already ask about: how often and how long customers were out, whether every meter read on time, how much treated water never reached a bill, how quickly work orders close, and whether operating cost is tracking the approved budget, each on one agreed definition.

We fix those definitions with your engineering and finance leads before a visual is drawn — which customer count is the denominator, which interruptions count as sustained, which consumption is authorized — then implement them as governed DAX measures (opens in new tab) so the same figure holds when sliced by district, substation, pressure zone and month.

Measure How it is defined Where the data comes from Where it misleads on its own
SAIDI Total customer minutes of sustained interruption ÷ total customers served Outage management system events joined to customer counts from billing A single storm can dominate the year unless major event days are reported separately
SAIFI and CAIDI Customers interrupted ÷ customers served; and SAIDI ÷ SAIFI, the average restoration time The same outage events and customer counts CAIDI can improve because more short outages were added, not because crews got faster
Meter read success Meters with a valid read in the period ÷ meters expected to read AMI head-end or meter data management system A high average hides the same small group of meters failing every cycle
Non-revenue water Water losses plus unbilled authorized consumption, from system input volume Production or purchase meters, billing consumption, and recorded unbilled uses Billing-cycle timing makes any one month noisy; it reads best on a rolling basis
Work order backlog Open work orders by type and age at period end Work and asset management system A count treats a meter swap and a substation repair as equal; labor hours fix that
Budget variance Actual less approved budget, by function and department, month and year to date General ledger and the adopted budget Purchased power or chemical cost swings can mask controllable overspend unless separated

Want to see this applied to your reliability and water loss reporting? Book a free demo and bring your current report.

Book my free demo →

How are outage minutes and SAIDI calculated in Power BI?

We calculate SAIDI, SAIFI and CAIDI from outage events in your outage management system, using the IEEE 1366 definitions: customer minutes interrupted divided by customers served, sustained interruptions divided by customers served, and the ratio of the two. Major event days are flagged separately, so storm days and blue-sky performance are reported side by side.

The hard part is the denominator and the hierarchy. Customers served has to come from billing for the same period, and each outage has to roll up through the device, feeder, substation and district it actually sat behind, which means the connectivity model in GIS and the outage records have to agree. We build that hierarchy once, as a dimension the whole model shares, and keep momentary interruptions out of the sustained indices unless you report them. For context against peers, the EIA-861 annual electric power industry data (opens in new tab) publishes reliability figures reported by utilities.

How do you report water loss and non-revenue water?

We follow the structure of the AWWA water audit: system input volume, less billed and unbilled authorized consumption, leaves water losses, which split into apparent losses such as meter under-registration and unauthorized use, and real losses from leaks and main breaks. Each component is its own measure, so a falling number has an explanation attached.

The modeling trap is time. Production meters read daily while customers are billed on rolling cycles, so a naive monthly subtraction swings for no physical reason. We align consumption to the period it was used rather than the date it was billed, and show the loss trend on a rolling basis beside the monthly figure. Main breaks and leak repairs from the work management system sit on the same timeline, so a drop in real losses can be tied to the repairs that caused it.

Which utility systems can you connect?

We connect the systems co-ops and municipal utilities actually run: the customer information and billing system, the outage management system, AMI head-end and meter data management, GIS, work and asset management, SCADA historians and the general ledger. The route in, whether a reporting database, an API or a scheduled export, sets the refresh cadence.

System What we take from it Typical route
Customer information and billing Accounts, rate classes, billed consumption and revenue, estimated bills, arrears Reporting database or replica where the vendor allows it; scheduled export where it does not
Outage management Outage events, devices, customers affected, start and restore times, cause codes Database connection or event export, joined to the GIS hierarchy
AMI head-end and meter data management Read success, missed and validated reads, meter events, interval consumption summaries Summarized at the source to daily meter grain before it reaches the model
GIS Substation, feeder, device and pressure-zone hierarchy, mains and service locations Feature table extract, treated as a slowly changing dimension
Work and asset management Work orders by type and status, labor hours, materials, main break and leak repairs Database connection or API, joined on asset and location keys
SCADA historian Production and purchase meter volumes, reservoir levels, substation loading Historian API or warehouse feed, aggregated to daily grain
General ledger and budget Actuals by account, department and function; the adopted budget Native connector or ledger export through the on-premises data gateway (opens in new tab) where the server is in-house

Meter data is the volume problem. Interval reads for every meter are far too granular to import whole, so we aggregate at the source and use incremental refresh (opens in new tab) so each refresh only touches recent days. Where a vendor offers exports only, we say so plainly and design around the cadence that gives. Network operators face the same volume problem with usage and telemetry data, which is why our Power BI for telecom companies builds use the same aggregate-at-source approach.

How do you track operating cost against budget?

We join the general ledger to the approved budget at account and department level, then map both to the functions a utility manages by: generation or purchased power, distribution, treatment, customer service and administration. Variance shows monthly and year to date, with work order labor and materials explaining where the money actually went.

The finance side of the model follows the same patterns as our Power BI for finance teams work, and the monthly packet the general manager takes to the board or utility commission can be built as a Power BI board reporting dashboard that draws reliability, water loss and budget variance from this one model rather than from three spreadsheets.

Who sees which districts, substations and service areas?

Row-level security decides it. A line superintendent sees their own district's outages and work orders, a water operations manager sees their own pressure zones, and the general manager and board see the whole system. One published report serves everyone, and adding a district is a row in a mapping table, not a new report.

We implement it with row-level security (opens in new tab) mapped to your existing district and department structure. Our guide to setting up row-level security in Power BI walks through how those roles are configured and tested.

How is this different from an oil and gas build?

A utility is regulated distribution, measured per customer served; an upstream producer is measured per barrel lifted. Our oil and gas build covers well production, lease operating expense and AFE against actual. This build covers reliability indices, meter read performance, water loss, work orders and cost against an approved budget, with almost no shared measures.

What does it cost, and how fast?

You buy prepaid Flex hours that never expire. Starter is 20 hours ($2,500), Growth 40 hours ($4,600) and Power 80 hours ($8,000), with senior hourly work from $100. A first build covering reliability, metering and cost against budget usually fits inside one block, and most tasks ship within 3–5 business days of your approving the scope.

There is no project minimum. Every request is scoped and priced in hours before work starts, hours deduct only for work you approve, and unused hours stay banked for the next budget season or the next system migration. See how prepaid Flex hours work.

Who is this for?

General managers, finance directors, operations and engineering managers at electric cooperatives, municipal electric and water utilities, and small investor-owned or district water systems in the US. The common thread is a handful of systems that each report well alone, a board that wants one monthly picture, and no analyst free to rebuild it every month.

If you are a large utility with a dedicated analytics team and a compliance reporting program already in place, we can still help with a specific model or report, but the build described here is sized for organizations where one or two people own reporting alongside other jobs.

Bring the question your reliability and water loss reporting can’t answer yet to a free demo.

Book my free demo →

Dashboards we build for utilities

  • SAIDI, SAIFI and CAIDI by feeder
  • Outage causes ranked by minutes
  • AMI read success and missed meters
  • Water audit and non-revenue water
  • Work order backlog and aging
  • Operating cost vs approved budget
3–5

business days, typical

Prepaid

hours, never expire

You

own everything

A first utility build usually fits inside one Flex block, and hours deduct only for work you approve. See Flex pricing →

Reporting cost check

What manual reporting costs you today

Put a number on the time your team spends assembling your utility reporting by hand: exports, spreadsheet rework and copy-paste.

The math is simple: hours each person spends per week × number of people × 52 weeks gives the hours a year. Multiply by your loaded hourly cost for the dollars a year.

Use this in my request →

Scope approved before any hours are used · Hours never expire

Your numbers, your estimate. It is not a quote and not a savings promise; real hours are quoted in the scope estimate before any work begins.

How it works

From outage tickets and meter reads to one monthly picture

  1. 1

    Scope & connect

    On a free demo we walk your service territory, districts and systems, and agree the definitions: which customer count is the denominator, how major event days are treated, which consumption counts as authorized. You approve the hours, and we connect outage management, billing, meter data, work orders and the ledger into one model.

  2. 2

    Build & validate

    We build the substation, feeder and pressure-zone hierarchy, write the DAX for the reliability indices, read success, water loss and budget variance, and you tie the output back to your own outage reports, billing registers and month-end close until the numbers are ones you would hand the board.

  3. 3

    Launch & hand over

    We publish to your workspace, set scheduled refresh and row-level security by district and department, and train the people who will use it. The report, the model and the credentials are yours at handover, with optional ongoing support from the same block of hours.

Fair and square

Our promises, in plain English

Scope approved before any hours are used

Every request gets a scope estimate and the hours it needs before any work begins, so you approve the cost up front. Hours are deducted only for work you sign off on.

Hours never expire

Your prepaid hours are banked immediately, with no contracts and no recurring charges. Whatever you don’t use stays on your account, with no deadline to spend it by.

You own everything, in your tenant

You receive the report files, the semantic model, the DAX and the documentation, under your own Microsoft tenant and credentials. If you move the work in-house or to another partner, nothing is held hostage.

Refund in your first 4 hours

If you’re unhappy within the first 4 hours of your block, you get a full refund, no questions asked.

Straight answers. If a task is not a good fit for prepaid Flex hours, we will tell you rather than sell you something that will not serve you.

You work directly with Edward Pinela. The consultant who scopes your request is the same person who builds your data model, writes your DAX and designs your reports: a US-based, Microsoft-certified Power BI consultant with 20+ years on the Microsoft platform. No account managers in between, and nothing passed to an offshore team. About Edward

FAQ

Questions from general managers, engineers and finance directors

Yes, if that is how you report. We flag major event days using the IEEE 1366 method your engineering team already applies, then show SAIDI with and without them. The board sees storm performance and day-to-day reliability as two separate numbers, and nobody has to explain why a single storm erased a year of improvement.

Yes. From the meter data management system or AMI head-end we report read success by route, substation or meter type, the meters that missed reads for several days running, and the bills that went out on an estimate. The worklist ranks meters to visit, which is what a metering supervisor actually needs each morning.

Yes. Electric and water share customers, the billing system, work orders and the ledger, so they share one model. Reliability indices and water loss stay as separate measures with their own definitions, and the general manager can see both service lines on one page while each department sees only its own.

No. It reconciles to the same outage records, customer counts and ledger your filings come from, and it uses the definitions your engineering and finance teams already file under. It is a management reporting tool that makes filing preparation faster and easier to check. It does not replace your regulatory submission process.

You buy prepaid Flex hours that never expire: Starter 20 hours at $2,500, Growth 40 hours at $4,600, Power 80 hours at $8,000, with senior hourly work from $100. A first build covering outages, meter reads and cost against budget usually fits inside one block, and most tasks ship in 3-5 business days after you approve the scope.

See your outages, meters and budget on one page

Book a free demo. We'll map your districts and systems, then scope the build and tell you the hours it needs before any work begins — and your prepaid hours never expire.

Full refund if you’re unhappy in your first 4 hours · Hours never expire

Book a free demo

See what your utility reporting would take

Tell us the task. We reply within one business day, and you get a scope estimate and the hours needed before any work begins.

Step 1 of 2: What do you need?

How can we help? Pick one

Tap to add, or type your own:

Step 2 of 2: Where should we reply?

Used only to contact you about this inquiry.

We reply within one business day. Scope approved before any hours are used. We don’t sell your information.

Tell us the task. We scope it, you approve, and a senior consultant delivers — typically in 3–5 business days. Prepaid hours that never expire.

  • Prepaid hours from $100/hour — and they never expire
  • Senior-led delivery — 20+ years on the Microsoft platform
  • Typical 3–5 business day turnaround
  • Full refund if you’re unhappy in your first 4 hours
Book my free demo