What should a utility dashboard measure?
A utility dashboard should measure what the board and the regulator already ask about: how often and how long customers were out, whether every meter read on time, how much treated water never reached a bill, how quickly work orders close, and whether operating cost is tracking the approved budget, each on one agreed definition.
We fix those definitions with your engineering and finance leads before a visual is drawn — which customer count is the denominator, which interruptions count as sustained, which consumption is authorized — then implement them as governed DAX measures (opens in new tab) so the same figure holds when sliced by district, substation, pressure zone and month.
| Measure |
How it is defined |
Where the data comes from |
Where it misleads on its own |
| SAIDI |
Total customer minutes of sustained interruption ÷ total customers served |
Outage management system events joined to customer counts from billing |
A single storm can dominate the year unless major event days are reported separately |
| SAIFI and CAIDI |
Customers interrupted ÷ customers served; and SAIDI ÷ SAIFI, the average restoration time |
The same outage events and customer counts |
CAIDI can improve because more short outages were added, not because crews got faster |
| Meter read success |
Meters with a valid read in the period ÷ meters expected to read |
AMI head-end or meter data management system |
A high average hides the same small group of meters failing every cycle |
| Non-revenue water |
Water losses plus unbilled authorized consumption, from system input volume |
Production or purchase meters, billing consumption, and recorded unbilled uses |
Billing-cycle timing makes any one month noisy; it reads best on a rolling basis |
| Work order backlog |
Open work orders by type and age at period end |
Work and asset management system |
A count treats a meter swap and a substation repair as equal; labor hours fix that |
| Budget variance |
Actual less approved budget, by function and department, month and year to date |
General ledger and the adopted budget |
Purchased power or chemical cost swings can mask controllable overspend unless separated |
Want to see this applied to your reliability and water loss reporting? Book a free demo and bring your current report.
Book my free demo →
How are outage minutes and SAIDI calculated in Power BI?
We calculate SAIDI, SAIFI and CAIDI from outage events in your outage management system, using the IEEE 1366 definitions: customer minutes interrupted divided by customers served, sustained interruptions divided by customers served, and the ratio of the two. Major event days are flagged separately, so storm days and blue-sky performance are reported side by side.
The hard part is the denominator and the hierarchy. Customers served has to come from billing for the same period, and each outage has to roll up through the device, feeder, substation and district it actually sat behind, which means the connectivity model in GIS and the outage records have to agree. We build that hierarchy once, as a dimension the whole model shares, and keep momentary interruptions out of the sustained indices unless you report them. For context against peers, the EIA-861 annual electric power industry data (opens in new tab) publishes reliability figures reported by utilities.
How do you report water loss and non-revenue water?
We follow the structure of the AWWA water audit: system input volume, less billed and unbilled authorized consumption, leaves water losses, which split into apparent losses such as meter under-registration and unauthorized use, and real losses from leaks and main breaks. Each component is its own measure, so a falling number has an explanation attached.
The modeling trap is time. Production meters read daily while customers are billed on rolling cycles, so a naive monthly subtraction swings for no physical reason. We align consumption to the period it was used rather than the date it was billed, and show the loss trend on a rolling basis beside the monthly figure. Main breaks and leak repairs from the work management system sit on the same timeline, so a drop in real losses can be tied to the repairs that caused it.
Which utility systems can you connect?
We connect the systems co-ops and municipal utilities actually run: the customer information and billing system, the outage management system, AMI head-end and meter data management, GIS, work and asset management, SCADA historians and the general ledger. The route in, whether a reporting database, an API or a scheduled export, sets the refresh cadence.
| System |
What we take from it |
Typical route |
| Customer information and billing |
Accounts, rate classes, billed consumption and revenue, estimated bills, arrears |
Reporting database or replica where the vendor allows it; scheduled export where it does not |
| Outage management |
Outage events, devices, customers affected, start and restore times, cause codes |
Database connection or event export, joined to the GIS hierarchy |
| AMI head-end and meter data management |
Read success, missed and validated reads, meter events, interval consumption summaries |
Summarized at the source to daily meter grain before it reaches the model |
| GIS |
Substation, feeder, device and pressure-zone hierarchy, mains and service locations |
Feature table extract, treated as a slowly changing dimension |
| Work and asset management |
Work orders by type and status, labor hours, materials, main break and leak repairs |
Database connection or API, joined on asset and location keys |
| SCADA historian |
Production and purchase meter volumes, reservoir levels, substation loading |
Historian API or warehouse feed, aggregated to daily grain |
| General ledger and budget |
Actuals by account, department and function; the adopted budget |
Native connector or ledger export through the on-premises data gateway (opens in new tab) where the server is in-house |
Meter data is the volume problem. Interval reads for every meter are far too granular to import whole, so we aggregate at the source and use incremental refresh (opens in new tab) so each refresh only touches recent days. Where a vendor offers exports only, we say so plainly and design around the cadence that gives. Network operators face the same volume problem with usage and telemetry data, which is why our Power BI for telecom companies builds use the same aggregate-at-source approach.
How do you track operating cost against budget?
We join the general ledger to the approved budget at account and department level, then map both to the functions a utility manages by: generation or purchased power, distribution, treatment, customer service and administration. Variance shows monthly and year to date, with work order labor and materials explaining where the money actually went.
The finance side of the model follows the same patterns as our Power BI for finance teams work, and the monthly packet the general manager takes to the board or utility commission can be built as a Power BI board reporting dashboard that draws reliability, water loss and budget variance from this one model rather than from three spreadsheets.
Who sees which districts, substations and service areas?
Row-level security decides it. A line superintendent sees their own district's outages and work orders, a water operations manager sees their own pressure zones, and the general manager and board see the whole system. One published report serves everyone, and adding a district is a row in a mapping table, not a new report.
We implement it with row-level security (opens in new tab) mapped to your existing district and department structure. Our guide to setting up row-level security in Power BI walks through how those roles are configured and tested.
How is this different from an oil and gas build?
A utility is regulated distribution, measured per customer served; an upstream producer is measured per barrel lifted. Our oil and gas build covers well production, lease operating expense and AFE against actual. This build covers reliability indices, meter read performance, water loss, work orders and cost against an approved budget, with almost no shared measures.
What does it cost, and how fast?
You buy prepaid Flex hours that never expire. Starter is 20 hours ($2,500), Growth 40 hours ($4,600) and Power 80 hours ($8,000), with senior hourly work from $100. A first build covering reliability, metering and cost against budget usually fits inside one block, and most tasks ship within 3–5 business days of your approving the scope.
There is no project minimum. Every request is scoped and priced in hours before work starts, hours deduct only for work you approve, and unused hours stay banked for the next budget season or the next system migration. See how prepaid Flex hours work.
Who is this for?
General managers, finance directors, operations and engineering managers at electric cooperatives, municipal electric and water utilities, and small investor-owned or district water systems in the US. The common thread is a handful of systems that each report well alone, a board that wants one monthly picture, and no analyst free to rebuild it every month.